![]() ![]() For more information, see the plans on the Planning Department’s web site. The Planning Board reviewed the amended plan at its Jmeeting. This amended plan for the Purple Line alignment and station location at the Silver Spring Transit Center will continue to be refined as Preliminary Design for this change progresses through 2017. ![]() There is no change to the Capital Crescent Trail near the Silver Spring Transit Center. This modification to the plan initially reviewed by the Planning Board on Mainvolves a change that will result in (1) the Purple Line alignment crossing Colesville Road at a different angle and (2) the placement of the station platform on the north side of the Silver Spring Transit Center (at the third level adjacent to the kiss-and-ride drop-off) instead of the south side nearer to the Metrorail and MARC/CSX tracks located at an elevation approximately 80’ above Colesville Road. The MTA Office of Transit Development and Delivery submitted a Purple Line Mandatory Referral Amendment related to the Purple Line alignment and platform location at the Silver Spring Transit Center Station. Purple Line Mandatory Referral Amendment – Silver Spring Transit Center Construction is anticipated to be completed in 2023. An east-west route connector for Montgomery and Prince George’s counties, the Purple Line has been under study since 1992. ![]() Construction is currently underway for the Purple Line, a proposed 16-mile light rail line with 21 stations, which will run from Bethesda to New Carrollton and provide direct connections to Metrorail, local and inter-city bus, the MARC train and Amtrak. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |